Some of the Maintenance at R Larkman Ltd

26th February

IMG_5205

Dismantling the engine

IMG_5206

17 March

Preparing to bench test the Volvo 2003

IMG_5215

IMG_5216

IMG_5221

Engineer Peter Norris

20th March

IMG_5224

Replacing an old hatch Vent

24th March

IMG_5226

Restoration of the large fore hatch. Removed and sent to Eagle Boat Windows www.eagleboatwindows.co.uk for dismantling and reglazing in 12mm acrylic.

30th March

Reinstallation of the engine in to the ship

IMG_5249

IMG_5251

New intake seacock, skin fitting & strainer and so easy to operate

31st March

IMG_5252

So after removal of the cylinder head and heat exchanger assemblies. The valves and valve seats were recut and lapped in.  The cylinder head surface ground.  Fuel  injectors cleaned and tested.  New gaskets for the head.  Cleaned heat exchanger and flushed all water ways. Refit heat exchanger with new thermostat.  Sea water pump seals replaced.  Starter motor cleaned and tested and brand new spare now on board.  Front engine mountings replaced.  Engine painted.

Calorifier hoses replaced.  Two new prop shaft cutlass bearings.  Replaced cracked and old fuel and exhaust hoses & calorifier pressure valve………………………..

2nd April

IMG_5260

Polishing the Top Sides

IMG_5261

10th April

IMG_5264

Relaunch Day

IMG_5266

Dawn and Dick (Larkman).

IMG_5267

Fred Larkman in a theatrical pose..

IMG_5270

Anchored for the night The Rocks R Deben

IMG_5271

 

 

 

Leave a Comment